On Tuesday morning around 10am, BFD, BPD and Boston EMS responded to a call for a crane that collapsed at a construction site located at 959 Dorchester Ave. at Crescent Ave.
According to a post on social via via BFD – there were no injuries to report.
Boston Inspectional Services showed up on scene to review the structural integrity of the building.
This construction project is constructing a mixed-use development consisting of a five-story, mixed-use building totaling approximately 43,800 square feet. There will be 38 units with commercial space on ground level. You can learn more here.
Image via BFD on twitter.
Maureen Dahill is the editor of Caught in Southie and a lifelong resident of South Boston sometimes mistaken for a yuppie. Co-host of Caught Up, storyteller, lover of red wine and binge watching TV series. Mrs. Peter G. Follow her @MaureenCaught.